Installing wind power against the Nordic Winter testupdate
Installation of 22 6.6-170 SG turbines
Description
FairWind took on the Installation of 22 Siemens Gamesa SG
6.6-170 T165 turbines for SGRE, each with eight
tower sections.
- Pre-assembly to final installation
was completed within a timeframe of
six months - Two shift operations for installation and
one shift for internal finishing
Results
- Efficient execution of the pre-assembly and installation process
- Maintained safety and quality standards throughout the project
- Successfully completed phase one of the installation within the scheduled timeframe.